Logo Procetradi
Client: Cerro Verde
Technology: Survalent
Date: 2015

We updated and maintain the redundant SCADA system SCADA / ICCP, which integrates signals from 2 power substations: SE Cerro Verde and SE Socabaya, in addition to monitoring and controlling Medium Voltage Substations within Cerro Verde (SE Hidrometrologia, SE Poza de Procesos ).

The system was put into operation in 2007 and remains in force to date. This system integrates SEL 2032 relays, ION 8600 meters, ABB REF Model protection relays, ABB COM 600 RTU and TAPCON voltage regulator.

This maintenance service was able to optimize the delivery in ICCP protocol to the COES in order to comply with the NTIITR standard of the COES.