Logo Procetradi
Client: Ende DeOruro
Location: Oruro, Bolivia
Date: 2020

Implementation of a videowall system for the Control Center of the National Electrification Company Ende DeOruro, in Bolivia. Screens in 3x2 configuration, 1 controller and an engineering station were installed for continuous 24x7 monitoring of the operation of the Power Electric System.

The implementation stages were:

  • Basic and detail engineering
  • Supply of 6 displays, videowall controller and engineering station
  • Assembly and installation
  • Videowall system configuration
  • SAT tests
  • Commissioning of the project
  • Staff training